You can add or remove working time directly on a card. The time is recorded on a step of the card, as labor or equipment time.
Add/remove working time #
Note: from the open card, the clock icon uses the talent logged in on the card’s Log in button, without asking for the PIN again. If no talent is logged in, the PIN entered logs that talent in on the card. From the board as from the open card, if the talent has not clocked in to their shift, ALIX asks them to clock in or records the clock-in automatically, depending on the Punch on card move configuration. For more information, see the Log in on an open card section of the Card overview page.
- From the menu on the left, choose Operations.
- On the desired card, click the clock icon.

Fill in the requested information, including the following details:

- Step: the current step is pre-selected, but you can choose another step.
- Start date and End date: enter the start and end date and time with the calendar.
- Clock: enter a number of hours worked.
Labor time/equipment time: choose whether the time entered is for labor or equipment.
Note: when planned tools are associated with the card, equipment time entries are automatically duplicated on planned tools marked as used at the corresponding step. For more details, see the Planned tools page.
Add/remove: to add time, choose +. To remove time, choose –.
Click Save when you’re done.
The total time entered can be found in the card, in the Steps tab.

Time entry in shipment steps #
When the card is in a shipment or waiting for shipment step, time entry works differently. You cannot add time directly on the card as in the other steps.
| Step | Time entry |
|---|---|
| Waiting for shipment | To record time, choose one of the previous steps and add the time worked to it. |
| Shipment | Time is entered for the whole shipment, not on each card individually. ALIX then automatically distributes this time among all the cards included in the shipment. |


