- From the menu on the left, choose Operations.
- Open the Projects panel.

- Find the desired project, then click on the chevron on the left at the bottom of the project to display its cards.
Only cards with New status will be visible.

- Double-click the button at the top right corner of the card to advance it to the next step on the board.

It is also possible to take the card with the mouse and drag it to the desired step.
- When a production step is completed, move the card to the next step until it is shipped.
Use the operations board
Updated on 21-02-25



