It is possible to set up different ways to calculate work time for each value-added step. By default, steps are in manual time.
- In Settings, go to the Settings section, then Value streams.
- Click the edit icon at the bottom of the desired step.
- Check or uncheck the option to enter work time.
If checked: work time updates automatically. If the box is unchecked: work time is manual.
- Click the Save icon at the bottom of the step.