Each step of a card can have its own checklist to fill in before moving on to the next step. On the card, these checklists are displayed in the Checklist tab.
Add/edit a checklist #
A checklist can be added when creating a production recipe for an item. See this article to learn how to do this.
The content and configuration of a checklist are defined in its template. See the checklists article for more details.
View the checklists of a card #
- From the menu on the left, choose Operations.

- Find the desired card in the board, then click on it. The card opens.
- Click the Checklist tab, located after the Steps tab. The current step’s checklist is displayed.

- To view the other steps’ checklists, turn off the Current step only toggle at the top right. The card’s steps that have a checklist are displayed as an accordion: the current step is expanded, the others are collapsed. Click a step’s header to expand or collapse it; several steps can be expanded at the same time.

Note: the accordion only displays the steps visible to your user.
Note: if the When opening a card in full card view, show the Checklist tab instead of General (if the current step has a checklist) configuration is enabled, the card opens directly on the Checklist tab. For more information, see the Operations board configurations page.
Check the list #
- In the Checklist tab, check each item on the list.

- Once all the items have been checked, if the step is compliant, click on the Is compliant check box.

Add a comment on the list #
Depending on the configuration of the list, a Comments field is displayed in the header of the list, below the instructions.
- The field is only displayed for the “with comment” options. For the “with required comment” options, it carries the (required) marker.
- The comment is saved automatically when you leave the field.

Move the card to the next step #
When a card is moved to a following step, ALIX checks the checklist of the step it is leaving, according to the configuration of the list.
It is impossible to move the card to a following step if the list is not compliant and its option is “not allowed”.
It is impossible to move the card to a following step if the comment of the list is empty and its option is “with required comment”, even for an “allowed” option. For the “only for non-compliant” options, the comment is only required if the list is not compliant.
In both cases, no window opens: a message explains the refusal and the card stays on its step. Complete the list or enter the comment in its header, then move the card again.
Note: moves to a previous step are never blocked. On a move that skips several steps, only the checklist of the step the card is leaving is checked.
Comment on an item of the list #
Each row of the list displays a comment icon at the end of the row, next to the camera icon, with the number of comments of the row.
Note: if the Enable comments toggle is not on for the row, the icon is greyed out and displays the “No comment asked” tooltip. See the checklists article for more details.
- Click the comment icon of the row. A window titled with the row’s title opens and displays the comment thread.

- Write your comment, then click Send. The comment is added to the thread with its author and date, and the counter of the row is updated.
Groups in a list #
When a list has groups, their headers are displayed across the full width of the list. Groups are expanded by default: click a header to collapse or expand its items.

Groups are defined in the template of the list. See the checklists article for more details.
Print the list #
To print the list, click its print icon. The printout includes the group headers and the comment of the list; the comments of the rows are not printed.
Copy a card #
When a card is copied, the structure of its checklists follows the copy: the items, the groups and the comment activation. The comments and the checked items start from scratch on the new card.






